Kitchen Remodeling prices on the Peninsula

Two-Week Kitchen Refresh

from$15,000

2 weeks

Cabinet boxes are sound; counters, backsplash and fronts are tired.

  • Quartz countertops, undermount sink and faucet
  • Tile or slab backsplash
  • Cabinet painting or new doors on existing boxes
  • New hardware, under-cabinet LED lighting
  • Appliance reinstall in the same footprint
  • Paint and final clean

Not included: Moving the sink, range or fridge; New appliances.

Full Kitchen Remodel

from$35,000

4–6 weeks

New cabinets and layout in the existing room.

  • Demolition, new semi-custom or custom cabinets
  • Sink, range and fridge moves within the room
  • Quartz or quartzite counters, full backsplash
  • Dedicated circuits, recessed lighting, Title 24 controls
  • Ducted range hood, kitchen flooring
  • Permit, inspections and appliance installation

Not included: Appliances (we install yours); Wall removal (see Open-Concept).

Open-Concept Kitchen

from$50,000

8–12 weeks

Kitchens where a non-structural wall or soffit comes out to open the room. Load-bearing walls wait for our B license.

  • Everything in the Full Remodel
  • Partition and soffit removal, ceiling and floor patched across the new room
  • Kitchen island with seating, plumbing and power
  • Flooring across the opened room
  • Electrical for induction where the panel allows

Not included: Load-bearing wall removal and beams; Panel or service upgrades, priced separately.

What moves the price

  • Cabinets. Cabinets are usually the largest single line. Painted existing boxes, IKEA, semi-custom and custom inset are four very different numbers.
  • Layout changes. Keeping the sink, range and fridge in place is the low end. Moving the sink to an island is the big jump.
  • Walls and soffits. Taking out a soffit or a non-structural partition adds framing, drywall and flooring across the opened room.

Every line item, low to high: kitchen remodel cost in the Bay Area. All packages side by side: our pricing page.

Ballpark estimator

What would yours cost?

1. Room
2. Size and scope
Starts at—

A range from our published packages, before a site visit. Your written estimate sets the exact price.

Send me the detailed estimate

What is included in a Willow kitchen remodel

  1. Design and selections. A measured layout, cabinet drawings, appliance specs and a selection meeting for counters, tile and fixtures.
  2. Protection and demolition. Dust walls, floor protection through the house, demolition, haul-away, and a temporary sink if you want one.
  3. Framing. Soffit and non-structural partition removal, blocking for upper cabinets, patching walls and ceiling. Load-bearing walls wait for our general building license.
  4. Electrical. Dedicated appliance circuits, induction-ready wiring, recessed and under-cabinet lighting to Title 24.
  5. Plumbing and gas. Sink, dishwasher and fridge water lines; island plumbing; gas capped or run as you choose.
  6. Cabinets and counters. Cabinet installation, template and install of quartz, quartzite or porcelain counters.
  7. Backsplash and finish. Tile or slab backsplash, hardware, appliance install, paint and final clean.
  8. Permit and walk-through. Permit, inspections, a punch list walk and the written warranty.

Not included unless quoted: fixtures and finishes above the package allowances, appliances, and repairs to hidden damage, which we price in writing before we fix them.

How long a kitchen remodel takes

  • Kitchen refresh2 weeks
  • Full kitchen4–6 weeks
  • Open-concept kitchen8–12 weeks

Cabinet lead time comes first: semi-custom cabinets usually take several weeks to arrive and custom longer. We order before demolition, so your kitchen is out of service only while we are on site. The week-by-week version is on how a Willow remodel runs.

Permits and inspections

A kitchen remodel needs a permit for new circuits and for moved plumbing or gas. We prepare the submittal, pull the permit and attend the inspections, including the Title 24 lighting and ventilation checks.

CityPermits fromTypical review
Palo AltoCity of Palo Alto Development Servicesabout 2 weeks on the city’s express track or 30 days on standard review, plus any correction rounds
Menlo ParkCity of Menlo Park Building Divisionabout 4–8 weeks for a complete submission; we confirm the current time when we apply
AthertonTown of Atherton Building Departmentabout 4–6 weeks for interior work; longer when the exterior changes and design review applies

Kitchen Remodeling by city

We also work in 30 more cities; see where we remodel.

Types of kitchen remodeling projects

  • The two-week kitchen refresh
  • Kitchen cabinet installation
  • Cabinet refacing and refinishing
  • Countertop replacement and installation
  • Adding a kitchen island
  • Open-concept kitchen remodeling
  • Small and galley kitchen remodeling
  • Backsplash and kitchen tile
  • Kitchen lighting, outlets and panel upgrades
  • Eichler kitchen remodeling
  • Switching your kitchen from gas to induction

Kitchen Remodeling questions

How much does a kitchen remodel cost on the Peninsula?

Our three kitchen packages and their prices are at the top of this page; the line items are on our kitchen remodel cost page.

How long does a kitchen remodel take?

Two weeks for a refresh and four to six for a full kitchen, plus cabinet lead time before we start.

Do I need a permit?

For new circuits or moved plumbing or gas, yes. We pull it and handle inspections.

How do I cook during the remodel?

Most clients stay home. We seal off the kitchen and can set up a temporary sink and the old fridge in another room.

Do you install IKEA cabinets?

Yes. We assemble and install IKEA, semi-custom and custom lines, and we check every order against the drawings before it ships.

What does the warranty cover?

Our workmanship, in writing. Appliances and cabinets carry their manufacturers’ warranties, which we register in your name.

How do payments work?

A deposit of $1,000 or 10% of the price, whichever is less, at signing; after that you pay as the work is completed. The full schedule is on our pricing page.

What should I decide before the site visit?

Whether anything should move, which appliances you want (they set the cabinet sizes), and a rough budget. We take it from there.

Get a written kitchen remodel estimate

Tell us about the room. We visit the same week, measure, and send a written, itemized estimate within 48 hours.

Call (650) 507-4525

We answer within 10 minutes, Mon–Sat 7 AM–7 PM.